10 August 2019

C. Steinweg, Sohar Port, Liwa, Sohar – Sultanate of Oman

Client: Dubai World Trade Centre Location: Oman Project Value: Confidential Purpose: Reinstatement cost assessment Project Background The project involved undertaking reinstatement cost assessments for insurance purposes on a number of different buildings and structures belonging to C. Steinweg Oman LLC. This included a mixture of offices, warehouses, workshops and other facilities located within the Sohar Port. Our Services We undertook […]
9 August 2019

Euroblast Middle East – Abu Dhabi

We undertook an initial document audit and progress payment certificates for the above property. This included a review of all documentation provided by the client including payment certifications, variations, delays and all relevant contract documents. We provided comment on the progress of the development as a whole, highlighting the progress of works in percentage terms.
9 August 2019

Private Island Resort – Seychelles

Our investor client (the prospective purchaser) required us to undertake a technical due diligence survey of an established private luxury resort in the Seychelles to ensure that the resort (comprising multiple buildings and assets) to ensure the report was free from significant defects, to highlight any items that would affect value and the likely 10-year CAPEX lifecycle costs given the current condition.
9 August 2019

Five Star Hotel – Dubai

Our investor client (the prospective purchaser) required us to review undertake a technical due diligence survey of the newly completed hotel to ensure that the building has been completed in accordance with the SPA, to the requisite quality, to highlight any items that would affect value and the likely 10-year CAPEX lifecycle costs.
9 April 2019

University Campus – Sharjah

On behalf of the AUS, we controlled a contractual process of designing, tendering, and project managing various alteration and refurbishment works. The process involved taking briefs from the internal PM team and then managing the contractual aspects on their behalf. We carried out full audits of the premises, including student health and safety and fire safety inspections of the various […]
10 August 2018

Dubai Marina Master Community – Dubai

Client: Emaar Location: Dubai Marina, Dubai Purpose: Reserve fund study and life cycle costing The project involved undertaking reserve fund studies and condition assessments of the assets to a number of towers located in Dubai Marina. We undertook a physical inspection of the communal areas and assets to all of the buildings in each of the developments listed above. The […]
9 August 2018

Emaar – Dubai

The project involved undertaking reserve fund studies and condition assessments of the assets to the following Emaar developments; Burj Views; 29 Boulevard; Central Boulevard; The Residences Phase 1; The Residences Phase 2; Emaar Square and South Ridge.
10 August 2017

Princess Tower – Dubai

Client: Kingfield Owners Association Location: Dubai Marina, Dubai Purpose: Property inspection handover report Cavendish Maxwell were instructed to undertake a Property Inspection handover report for Princess tower, the second tallest residential building in the world and the tallest in Dubai (2016). By undertaking the survey, we were able to identify a number of areas which were not adequately fireproofed which […]
9 August 2017

Noor Al Ahli Hospital – Al Ain

Client: Noor Al Ahli Hospital Location: Al Ain Project Value: Confidential Purpose: Construction progress and payment certificate verification reports Project Background The project involved a new build private hospital project located in Al Ain. The hospital is currently under construction and is due to be completed next year. Our Services We were appointed by our client to undertake third party […]
9 August 0207

15-year Life Cycle Cost Analysis Reports on Mixed-used Towers – Abu Dhabi

ICT are a developer based in Abu Dhabi who own a number of commercial towers throughout the Emirate.  ICT required a life cycle cost analysis undertaken across their developments in Abu Dhabi including Nation Towers, Al Aryam Tower, Silver Wave Tower, Marasy Buildings and their staff accommodation towers.

Other Case Studies

Cranes – Dubai

Client: Private Company – Cranes Type: Cranes Reason for study: Loan Security Scope of Work: The assets are those used in building construction ranging from tower cranes to rough terrain cranes, welding machines, lighting towers, personnel access and articulated boom lifts.

Dry Coldroom Storage – Dubai

Client: Private Company – Coldroom Storage Type: Coldroom Storage Reason for study: Internal Purposes Scope of Work: Multilevel dry storage warehouse and a palletised refrigerated cold and freezer storage facility.

Oman-based Master Developer

Client: Oman-based Master Developer Type: Market and Feasibility Study Location: Duqm, Oman Assets Covered: Residential, hospitality, retail, and entertainment. Reason for Study: Internal Strategy and Project Phasing