Building Surveying

Showing posts for building surveying

9 August 2019

Five Star Hotel – Dubai

Our investor client (the prospective purchaser) required us to review undertake a technical due diligence survey of the newly completed hotel to ensure that the building has been completed in accordance with the SPA, to the requisite quality, to highlight any items that would affect value and the likely 10-year CAPEX lifecycle costs.
9 April 2019

University Campus – Sharjah

On behalf of the AUS, we controlled a contractual process of designing, tendering, and project managing various alteration and refurbishment works. The process involved taking briefs from the internal PM team and then managing the contractual aspects on their behalf. We carried out full audits of the premises, including student health and safety and fire safety inspections of the various […]
10 August 2018

Dubai Marina Master Community – Dubai

Client: Emaar Location: Dubai Marina, Dubai Purpose: Reserve fund study and life cycle costing The project involved undertaking reserve fund studies and condition assessments of the assets to a number of towers located in Dubai Marina. We undertook a physical inspection of the communal areas and assets to all of the buildings in each of the developments listed above. The […]
9 August 2018

Emaar – Dubai

The project involved undertaking reserve fund studies and condition assessments of the assets to the following Emaar developments; Burj Views; 29 Boulevard; Central Boulevard; The Residences Phase 1; The Residences Phase 2; Emaar Square and South Ridge.
9 August 0207

15-year Life Cycle Cost Analysis Reports on Mixed-used Towers – Abu Dhabi

ICT are a developer based in Abu Dhabi who own a number of commercial towers throughout the Emirate.  ICT required a life cycle cost analysis undertaken across their developments in Abu Dhabi including Nation Towers, Al Aryam Tower, Silver Wave Tower, Marasy Buildings and their staff accommodation towers.

Stay up to date

SIGN UP

Menu
Quick Links
Follow us